Table of Contents
  • Home
  • /
  • Blog
  • /
  • How to Fix CVE-2025-0493: Critical Path Traversal Vulnerability in MultiVendorX WordPress Plugin?
January 31, 2025
|
8m

How to Fix CVE-2025-0493: Critical Path Traversal Vulnerability in MultiVendorX WordPress Plugin?


Security fix guide for CVE-2025-0493 vulnerability affecting MultiVendorX systems.

The MultiVendorX plugin, a popular choice for creating multi-vendor marketplaces with WooCommerce, has recently been identified as having a critical security flaw. Tracked as CVE-2025-0493, this vulnerability allows unauthenticated attackers to perform path traversal attacks, potentially leading to severe consequences such as data breaches, remote code execution, and complete server compromise. This article provides a comprehensive guide for security professionals on understanding and remediating this vulnerability effectively. We will delve into the technical aspects of the flaw, its potential impact, affected versions, detection methods, and concrete steps to secure your WordPress installations.

A Short Introduction to the MultiVendorX Plugin

MultiVendorX – The Ultimate WooCommerce Multivendor Marketplace Solution is a WordPress plugin that transforms a standard WooCommerce store into a comprehensive multi-vendor marketplace. It enables multiple vendors to sell their products through a single platform, offering features for vendor management, product listings, commissions, and more. Given its extensive functionality and popularity, securing this plugin is crucial for maintaining the integrity of any online marketplace using it. The plugin aims to simplify marketplace creation, providing an intuitive interface for both the administrator and vendors. It is widely used by businesses looking to facilitate a platform for various sellers, making it an attractive target for malicious actors seeking to exploit vulnerabilities.

Summary of CVE-2025-0493

  • CVE ID: CVE-2025-0493

  • Description: Improper Limitation of a Pathname to a Restricted Directory ('Path Traversal') vulnerability allowing unauthenticated file inclusion.

  • CVSS Score: 9.8 (Critical)

  • CVSS Vector: CVSS:3.1/AV:N/AC:L/PR:N/UI:N/S:U/C:H/I:H/A:H

The vulnerability lies in how the MultiVendorX plugin handles the tabname parameter. Specifically, it fails to properly validate and sanitize this parameter, which is used to include files within the application. This lack of input validation allows an unauthenticated attacker to manipulate the tabname parameter to include arbitrary PHP files from the server. By crafting specific requests, an attacker can force the plugin to execute PHP code from locations that would otherwise be inaccessible or restricted. This can lead to a variety of malicious actions, including accessing sensitive data, bypassing access controls, and, critically, achieving remote code execution on the server. The flaw highlights a severe lapse in security best practices regarding user input handling.

Impact of CVE-2025-0493

This vulnerability poses a significant risk due to its potential for severe impacts. Unauthenticated attackers can exploit this flaw to include and execute arbitrary PHP files, leading to:

  1. Bypass of Access Controls: Attackers can circumvent intended restrictions, gaining access to sensitive areas of the application that should normally be protected.

  2. Data Breach: By accessing and executing malicious files, attackers can extract sensitive information, which could lead to privacy breaches and compliance violations.

  3. Remote Code Execution (RCE): Attackers who successfully include malicious PHP files can achieve remote code execution. If they can upload a PHP file to the server (through a separate vulnerability or misconfiguration), they can include and execute this file leading to complete server compromise.

  4. Integrity Compromise: Successful exploitation allows attackers to alter or delete data on the server, causing damage to the integrity of the application and database.

  5. Availability Issues: Remote code execution could be used to disrupt services or even take over the system, causing downtime or complete unavailability of the affected website. The severity of these impacts, coupled with the ease of exploitation, is reflected in the vulnerability's CVSS v3.1 base score of 9.8, highlighting the urgent need for remediation.

Products Affected by CVE-2025-0493

The vulnerability affects all versions of the MultiVendorX plugin up to and including version 4.2.14. The table below summarizes the affected and non-affected versions:

Product
Version(s) Affected
Version(s) Not Affected
MultiVendorX – The Ultimate WooCommerce Multivendor Marketplace Solution
Up to and including 4.2.14
4.2.15 and later

It is essential for organizations to verify their installed version of the MultiVendorX plugin and upgrade if necessary. Versions prior to 4.2.15 are vulnerable and require immediate patching or mitigation.

How to Check If Your Product Is Vulnerable?

Detecting if your MultiVendorX plugin is vulnerable involves several steps. While direct exploitation requires a specific HTTP request, you can perform several checks to assess the risk:

1. Plugin Version: The most straightforward check is to verify the installed version of the MultiVendorX plugin. Navigate to the plugins section in your WordPress admin panel and identify the version number. If it is 4.2.14 or earlier, your system is vulnerable.

2. Manual Request Analysis: Using a tool like Burp Suite or curl, you can simulate a request to the plugin and check how it handles the tabname parameter. Look for the following:

  • Send a GET request with a modified tabname parameter, such as /wp-content/plugins/multivendorx/templates/dashboard/settings.php?tabname=../../../wp-config.php.

  • If the server responds with content from wp-config.php or any other file outside the intended plugin directory, your system is vulnerable. This indicates that file inclusion is possible.

3. WAF Monitoring: If you have a Web Application Firewall (WAF) in place, examine the logs for suspicious requests targeting the MultiVendorX plugin. Look for attempts to access the plugin's files with path traversal patterns in the tabname parameter, such as ../ sequences.

4. Security Scanner Tools: Use vulnerability scanning tools that are regularly updated with the latest CVE information. These tools can identify vulnerable versions of WordPress plugins, including MultiVendorX, based on their signatures. They can also simulate exploit attempts and verify if the system is susceptible.

5. File System Monitoring: Monitor access logs for any unauthorized file reads from the server. This method can help detect if the plugin is being exploited by analyzing file access patterns.

These methods will help you accurately determine if your MultiVendorX plugin is vulnerable and take the necessary actions to secure it.

How to Fix the Vulnerability?

Addressing the path traversal vulnerability (CVE-2025-0493) in the MultiVendorX plugin requires a combination of immediate fixes and preventative measures. Here’s a breakdown of the recommended actions:

1. Update the MultiVendorX Plugin:

  • The primary remediation step is to upgrade to a version higher than 4.2.14. The vendor is expected to release a patch for this vulnerability, therefore update to the latest version available for MultiVendorX.

  • Regularly check for plugin updates within the WordPress admin panel and apply them as soon as possible.

2. Temporary Disable the Plugin:

  • If an immediate update is not available, or a patch has not been released yet, consider temporarily disabling the MultiVendorX plugin to prevent exploitation.

  • Disabling the plugin will remove all functionality it provides, so it's crucial to find an alternative solution or to update the plugin as quickly as possible.

3. Implement Input Validation and Sanitization:

  • If the vendor does not release a patch quickly, you need to configure a patch yourself, or use a plugin to implement input validation and sanitization for the 'tabname' parameter.

  • Ensure that file names or paths are properly checked and sanitized to prevent the inclusion of files outside the plugin’s directory.

  • Employ mechanisms that specifically allow expected values and block any potentially malicious or unexpected inputs.

4. WAF Rules:

  • Implement Web Application Firewall (WAF) rules to block requests with suspicious 'tabname' parameter values.

  • WAF rules can be configured to detect and block patterns like "../", "../../", or absolute paths in the tabname parameter.

  • Regularly update WAF rules to protect against new exploitation techniques.

5. Restrict File Permissions:

  • Limit file permissions on the server to minimize potential damage if an attacker gains access through file inclusion.

  • Grant only necessary file access permissions for the web server user account to avoid unrestricted access.

6. Monitor File Uploads:

  • If the functionality does not require PHP file uploads, implement a security policy to monitor, block, and audit any attempts to upload PHP files, and remove unnecessary or outdated PHP files from the server to reduce attack vectors.

7. Principle of Least Privilege:

  • Apply the principle of least privilege for file system access and PHP execution.

  • Grant only necessary permissions to required user accounts and PHP processes to limit any potential exploit.

8. PHP disable_functions Directive:

  • Use PHP's disable_functions directive in your PHP configuration to limit access to functions that can execute code or access the file system if possible.

  • This can provide an additional layer of security by preventing attackers from utilizing potentially dangerous PHP functions.

9. Keep WordPress Core, Plugins, and Themes Up-to-Date:

  • Ensure your WordPress core, all plugins, and themes are up-to-date to reduce the overall attack surface and prevent similar vulnerabilities from being introduced into your environment.

  • Regular updates help patch known flaws and safeguard your application against new threats. By implementing these fixes and preventive measures, you can effectively mitigate the risk associated with CVE-2025-0493 and protect your WordPress installations from path traversal attacks.

Found this article interesting? Keep visit thesecmaster.com, and our social media page on FacebookLinkedInTwitterTelegramTumblrMedium, and Instagram and subscribe to receive tips like this. 

You may also like these articles:

Arun KL

Arun KL is a cybersecurity professional with 15+ years of experience in IT infrastructure, cloud security, vulnerability management, Penetration Testing, security operations, and incident response. He is adept at designing and implementing robust security solutions to safeguard systems and data. Arun holds multiple industry certifications including CCNA, CCNA Security, RHCE, CEH, and AWS Security.

Recently added

Vulnerabilities

View All

Learn More About Cyber Security Security & Technology

“Knowledge Arsenal: Empowering Your Security Journey through Continuous Learning”

Cybersecurity All-in-One For Dummies - 1st Edition

"Cybersecurity All-in-One For Dummies" offers a comprehensive guide to securing personal and business digital assets from cyber threats, with actionable insights from industry experts.

Tools

Featured

View All

Learn Something New with Free Email subscription

Subscribe

Subscribe